Commit Graph

2 Commits

Author SHA1 Message Date
Alexander Brown
3b78dfbe1c test: migrate browser_tests/ to @e2e/ path alias and add lint rule (#10958)
## Summary

Complete the @e2e/ path alias migration started in #10735 by converting
all 354 remaining relative imports and adding a lint rule to prevent
backsliding.

## Changes

- **What**: Migrate all relative imports in browser_tests/ to use
`@e2e/` (intra-directory) and `@/` (src/ imports) path aliases. Add
`no-restricted-imports` ESLint rule banning `./` and `../` imports in
`browser_tests/**/*.ts`. Suppress pre-existing oxlint `no-eval` and
`no-console` warnings exposed by touching those files.

## Review Focus

- ESLint flat-config merging: the `@playwright/test` ban and
relative-import ban are in two separate blocks to avoid last-match-wins
collision with the `useI18n`/`useVirtualList` blocks higher in the
config.
- The `['./**', '../**']` glob patterns (not `['./*', '../*']`) are
needed to catch multi-level relative paths like `../../../src/foo`.

Follows up on #10735

┆Issue is synchronized with this [Notion
page](https://www.notion.so/PR-10958-test-migrate-browser_tests-to-e2e-path-alias-and-add-lint-rule-33c6d73d365081649d1be771eac986fd)
by [Unito](https://www.unito.io)

Co-authored-by: Amp <amp@ampcode.com>
2026-04-08 11:28:59 -07:00
Alexander Brown
1280d4110d fix: simplify ensureCorrectLayoutScale and fix link sync during Vue node drag (#9680)
## Summary

Fix node layout drift from repeated `ensureCorrectLayoutScale` scaling,
simplify it to a pure one-time normalizer, and fix links not following
Vue nodes during drag.

## Changes

- **What**:
- `ensureCorrectLayoutScale` simplified to a one-time normalizer:
unprojects legacy Vue-scaled coordinates back to canonical LiteGraph
coordinates, marks the graph as corrected, and does nothing else. No
longer touches the layout store, syncs reroutes, or changes canvas
scale.
- Removed no-op calls from `useVueNodeLifecycle.ts` (a renderer version
string was passed where an `LGraph` was expected).
- `layoutStore.finalizeOperation` now calls `notifyChange` synchronously
instead of via `setTimeout`. This ensures `useLayoutSync`'s `onChange`
callback pushes positions to LiteGraph `node.pos` and calls
`canvas.setDirty()` within the same RAF frame as a drag update, fixing
links not following Vue nodes during drag.
- **Tests**: Added tests for `ensureCorrectLayoutScale` (idempotency,
round-trip, unknown-renderer no-op) and `graphRenderTransform`
(project/unproject round-trips, anchor caching).

## Review Focus

- The `setTimeout(() => this.notifyChange(change), 0)` →
`this.notifyChange(change)` change in `layoutStore.ts` is the key fix
for the drag-link-sync bug. The listener (`useLayoutSync`) only writes
to LiteGraph, not back to the layout store, so synchronous notification
is safe.
- `ensureCorrectLayoutScale` no longer has any side effects beyond
normalizing coordinates and setting `workflowRendererVersion` metadata.

---------

Co-authored-by: Amp <amp@ampcode.com>
Co-authored-by: Christian Byrne <cbyrne@comfy.org>
Co-authored-by: jaeone94 <89377375+jaeone94@users.noreply.github.com>
Co-authored-by: AustinMroz <austin@comfy.org>
Co-authored-by: Hunter <huntcsg@users.noreply.github.com>
Co-authored-by: GitHub Action <action@github.com>
2026-03-13 08:43:18 -07:00