[PR #337] [MERGED] ci: pin verified Cemu AppImage download #315

Closed
opened 2026-10-15 12:50:47 +00:00 by bsakaguchi · 0 comments
Owner

📋 Pull Request Information

Original PR: https://github.com/games-on-whales/gow/pull/337
Author: @JBailes
Created: 5/13/2026
Status: ✅ Merged
Merged: 5/13/2026
Merged by: @JBailes

Base: master ← Head: security/pin-verified-cemu


📝 Commits (1)

  • e271628 ci: pin verified cemu appimage download

📊 Changes

2 files changed (+28 additions, -4 deletions)

View changed files

📝 images/base-emu/build-fedora/Dockerfile (+14 -2)
📝 images/base-emu/build/Dockerfile (+14 -2)

📄 Description

Pins the base-emu Cemu AppImage download to v2.6 and verifies the restored asset SHA256 before baking it into images. This removes the unverified latest-release selection for Cemu and forces the base-emu emulator layer to rebuild.


🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.

## 📋 Pull Request Information **Original PR:** https://github.com/games-on-whales/gow/pull/337 **Author:** [@JBailes](https://github.com/JBailes) **Created:** 5/13/2026 **Status:** ✅ Merged **Merged:** 5/13/2026 **Merged by:** [@JBailes](https://github.com/JBailes) **Base:** `master` ← **Head:** `security/pin-verified-cemu` --- ### 📝 Commits (1) - [`e271628`](https://github.com/games-on-whales/gow/commit/e271628a29f3fd2e0dcfc25228c63358e6cb3436) ci: pin verified cemu appimage download ### 📊 Changes **2 files changed** (+28 additions, -4 deletions) <details> <summary>View changed files</summary> 📝 `images/base-emu/build-fedora/Dockerfile` (+14 -2) 📝 `images/base-emu/build/Dockerfile` (+14 -2) </details> ### 📄 Description Pins the base-emu Cemu AppImage download to v2.6 and verifies the restored asset SHA256 before baking it into images. This removes the unverified latest-release selection for Cemu and forces the base-emu emulator layer to rebuild. --- <sub>🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.</sub>
bsakaguchi 2026-10-15 12:50:47 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
games-on-whales/gow#315
No description provided.