[PR #5002] [MERGED] docs(jeb): qualify Linux CE native workflows #6720

Closed
opened 2026-11-01 21:42:34 +00:00 by bsakaguchi · 0 comments
Owner

📋 Pull Request Information

Original PR: https://github.com/morluto/rea/pull/5002
Author: @gensokyo-dev
Created: 10/18/2026
Status: ✅ Merged
Merged: 10/18/2026
Merged by: @gensokyo-dev

Base: main ← Head: docs/4996-jeb-linux-native-audit


📝 Commits (2)

  • 837718b docs(jeb): qualify Linux CE native workflows
  • ff11e0a docs(jeb): record 6.7 integration controls

📊 Changes

5 files changed (+2000 additions, -8 deletions)

View changed files

📝 docs/jeb-analysis.md (+14 -4)
📝 docs/testing.md (+10 -4)
📝 experiments/analysis-efficiency/README.md (+5 -0)
➕ experiments/analysis-efficiency/jeb-linux-native.json (+1733 -0)
➕ experiments/analysis-efficiency/jeb-linux-native.md (+238 -0)

📄 Description

Summary

Qualify JEB Linux CE setup: use the verified direct headless launcher and engine-native method references, while preserving the earlier licensed-build verification scope. Correct the verifier documentation to identify its shared application/provider entrypoint.

Record the native audit: existing warm reads are already short; these findings do not justify another live-project cache. Runtime and contracts are unchanged.

Closes #4996.

Validation

  • Six alternating baseline workflows: 90 public stdio MCP calls + 6 real CLI parity queries over authored ELF and shipped SQLite, with independent source/nm/objdump checks, paging, stable facts/Evidence IDs, unchanged target bytes and owned cleanup.
  • Rebased onto main's 6.7.0 checkpoint; rebuilt and completed two additional workflows (30 MCP calls + 2 CLI parity queries). The guard-stopped SQLite attempt remains recorded separately.
  • npm run build:cached, npm run docs:check (5 README tests), npm run check:fast (uncached typecheck/lint on 6.7.0), formatting and diff checks passed. All heavy work used bounded process families and one CPU.
  • The report retains cold/warm costs, CPU/peak memory, offline serialization estimates and unsuccessful attempts. Actual model usage, GUI, CE Android/Java, other hosts and restart recovery remain unverified here. Existing reconnect work in #3754 is separate.

Author readiness

Human owner: @gensokyo-dev

The owner explicitly authorized ready PRs and delegated readiness entry in this session. The agent reviewed the final diff, relevant source and validation under that delegation; independent human review of this final diff is not asserted.

  • I reviewed the final diff and relevant existing code, understand the change and its edge cases, and take responsibility for the complete PR, including AI-assisted work.
  • I checked the evidence above, confirmed it supports the current change, and recorded meaningful validation gaps.
  • I declare this PR ready for initial maintainer review.

🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.

## 📋 Pull Request Information **Original PR:** https://github.com/morluto/rea/pull/5002 **Author:** [@gensokyo-dev](https://github.com/gensokyo-dev) **Created:** 10/18/2026 **Status:** ✅ Merged **Merged:** 10/18/2026 **Merged by:** [@gensokyo-dev](https://github.com/gensokyo-dev) **Base:** `main` ← **Head:** `docs/4996-jeb-linux-native-audit` --- ### 📝 Commits (2) - [`837718b`](https://github.com/morluto/rea/commit/837718b1968b5fd90762c4c54895b11e9f5478fd) docs(jeb): qualify Linux CE native workflows - [`ff11e0a`](https://github.com/morluto/rea/commit/ff11e0a493dbdf711a089cbab5fdfa644ba28589) docs(jeb): record 6.7 integration controls ### 📊 Changes **5 files changed** (+2000 additions, -8 deletions) <details> <summary>View changed files</summary> 📝 `docs/jeb-analysis.md` (+14 -4) 📝 `docs/testing.md` (+10 -4) 📝 `experiments/analysis-efficiency/README.md` (+5 -0) ➕ `experiments/analysis-efficiency/jeb-linux-native.json` (+1733 -0) ➕ `experiments/analysis-efficiency/jeb-linux-native.md` (+238 -0) </details> ### 📄 Description ## Summary Qualify JEB Linux CE setup: use the verified direct headless launcher and engine-native method references, while preserving the earlier licensed-build verification scope. Correct the verifier documentation to identify its shared application/provider entrypoint. Record the [native audit](https://github.com/morluto/rea/blob/ff11e0a493dbdf711a089cbab5fdfa644ba28589/experiments/analysis-efficiency/jeb-linux-native.md): existing warm reads are already short; these findings do not justify another live-project cache. Runtime and contracts are unchanged. Closes #4996. ## Validation - Six alternating baseline workflows: **90 public stdio MCP calls + 6 real CLI parity queries** over authored ELF and shipped SQLite, with independent source/nm/objdump checks, paging, stable facts/Evidence IDs, unchanged target bytes and owned cleanup. - Rebased onto main's 6.7.0 checkpoint; rebuilt and completed **two additional workflows (30 MCP calls + 2 CLI parity queries)**. The guard-stopped SQLite attempt remains recorded separately. - `npm run build:cached`, `npm run docs:check` (5 README tests), `npm run check:fast` (uncached typecheck/lint on 6.7.0), formatting and diff checks passed. All heavy work used bounded process families and one CPU. - The report retains cold/warm costs, CPU/peak memory, offline serialization estimates and unsuccessful attempts. Actual model usage, GUI, CE Android/Java, other hosts and restart recovery remain unverified here. Existing reconnect work in #3754 is separate. ## Author readiness Human owner: @gensokyo-dev The owner explicitly authorized ready PRs and delegated readiness entry in this session. The agent reviewed the final diff, relevant source and validation under that delegation; independent human review of this final diff is not asserted. - [x] I reviewed the final diff and relevant existing code, understand the change and its edge cases, and take responsibility for the complete PR, including AI-assisted work. - [x] I checked the evidence above, confirmed it supports the current change, and recorded meaningful validation gaps. - [x] I declare this PR ready for initial maintainer review. --- <sub>🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.</sub>
bsakaguchi 2026-11-01 21:42:34 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
morluto/rea#6720
No description provided.