[PR #93] [MERGED] ci: redraw the star chart on every push to main too #119

Closed
opened 2026-10-15 20:53:33 +00:00 by bsakaguchi · 0 comments
Owner

📋 Pull Request Information

Original PR: https://github.com/rehan-remade/universal-modder/pull/93
Author: @rehan-remade
Created: 10/5/2026
Status: ✅ Merged
Merged: 10/5/2026
Merged by: @rehan-remade

Base: main ← Head: fix/star-chart-on-push


📝 Commits (1)

  • 5e53fc4 ci: redraw the star chart on every push to main too

📊 Changes

1 file changed (+3 additions, -0 deletions)

View changed files

📝 .github/workflows/star-chart.yml (+3 -0)

📄 Description

What: the README star chart stayed at 3,540 stars. The 6-hourly schedule in `star-chart.yml` never fired after the workflow was added: GitHub drops scheduled runs under load, and the workflow had 0 runs. A manual run worked (3,825 stars).

This adds a `push` trigger on `main`, so every merge redraws the chart. The schedule stays as a backstop. The workflow pushes only to the `star-chart` branch, so it cannot trigger itself, and `concurrency` cancels overlapping runs.

  • the workflow is valid YAML, and its triggers are schedule, push and workflow_dispatch
  • authored by: Claude Code (Opus 5.5) with @rehan-remade

🤖 Generated with Claude Code


🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.

## 📋 Pull Request Information **Original PR:** https://github.com/rehan-remade/universal-modder/pull/93 **Author:** [@rehan-remade](https://github.com/rehan-remade) **Created:** 10/5/2026 **Status:** ✅ Merged **Merged:** 10/5/2026 **Merged by:** [@rehan-remade](https://github.com/rehan-remade) **Base:** `main` ← **Head:** `fix/star-chart-on-push` --- ### 📝 Commits (1) - [`5e53fc4`](https://github.com/rehan-remade/universal-modder/commit/5e53fc466bff5fd85b6597a6326b2c210c4ecfb5) ci: redraw the star chart on every push to main too ### 📊 Changes **1 file changed** (+3 additions, -0 deletions) <details> <summary>View changed files</summary> 📝 `.github/workflows/star-chart.yml` (+3 -0) </details> ### 📄 Description **What:** the README star chart stayed at 3,540 stars. The 6-hourly schedule in \`star-chart.yml\` never fired after the workflow was added: GitHub drops scheduled runs under load, and the workflow had 0 runs. A manual run worked (3,825 stars). This adds a \`push\` trigger on \`main\`, so every merge redraws the chart. The schedule stays as a backstop. The workflow pushes only to the \`star-chart\` branch, so it cannot trigger itself, and \`concurrency\` cancels overlapping runs. - [x] the workflow is valid YAML, and its triggers are schedule, push and workflow_dispatch - [x] authored by: Claude Code (Opus 5.5) with @rehan-remade 🤖 Generated with [Claude Code](https://claude.com/claude-code) --- <sub>🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.</sub>
bsakaguchi 2026-10-15 20:53:33 +00:00
Sign in to join this conversation.
No labels
pull-request
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
rehan-remade/universal-modder#119
No description provided.