mirror of
https://github.com/Comfy-Org/ComfyUI_frontend.git
synced 2026-07-19 02:06:38 +00:00
Compare commits
1 Commits
fix/legacy
...
nathaniel/
| Author | SHA1 | Date | |
|---|---|---|---|
|
|
cfb1be400f |
730
GIT_BRANCHING_STRATEGY.md
Normal file
730
GIT_BRANCHING_STRATEGY.md
Normal file
@@ -0,0 +1,730 @@
|
||||
# Git Branching and Release Strategy
|
||||
|
||||
Status: Proposed
|
||||
Scope: ComfyUI_frontend branching, release management, and environment promotion
|
||||
Audience: frontend engineers, release rotation, QA, cloud and core release stakeholders
|
||||
|
||||
This document does three things:
|
||||
|
||||
1. Maps the current branching and release process and its measured pain points.
|
||||
2. Reviews a draft proposal to replace it with a 4-tier environment-branch model
|
||||
(testing, dev, staging, main), including an honest scorecard and a
|
||||
keep-or-reject disposition for every element of that proposal.
|
||||
3. Specifies the recommended strategy, how it addresses each pain point, and a
|
||||
phased rollout plan with risks and open questions.
|
||||
|
||||
## 1. Executive summary
|
||||
|
||||
The current process is not "only main". The repo runs one eternal development
|
||||
branch plus 55 frozen release branches (38 core lines, core/1.6 through
|
||||
core/1.47 with gaps; 17 cloud lines, cloud/1.31 through cloud/1.47), a
|
||||
label-driven cherry-pick backport pipeline,
|
||||
and a biweekly promotion train into ComfyUI core. The pain is real but it is
|
||||
not caused by a missing environment hierarchy. It is caused by the distance
|
||||
between main and the shipped lines: the longer a pinned release line lives,
|
||||
the more cherry-picks it needs, the harder each one gets, and the bigger and
|
||||
riskier each release batch becomes.
|
||||
|
||||
The draft 4-tier proposal is reviewed in section 4. Verdict: do not adopt as
|
||||
written (overall 4/10 for this repo), because it models a single-track web
|
||||
application while this product permanently ships three concurrent version
|
||||
tracks, and its central promise (eliminating backports) is unachievable while
|
||||
ComfyUI core pins an exact frontend package version. Eight of its underlying
|
||||
instincts are correct and are adopted into the recommendation.
|
||||
|
||||
The recommended strategy (section 6) is: one eternal branch (main), short-lived
|
||||
version branches only where a pinned version demands them (core/x.y), pipeline
|
||||
promotion of build-once artifacts for cloud environments instead of environment
|
||||
branches, hard freeze-as-code and drift limits, invariant checks instead of
|
||||
notification bots, and a machine-maintained production pointer that gives git
|
||||
visibility into what is deployed without human merge ceremony. This direction
|
||||
aligns with and extends the org's existing shipping-speed initiative rather
|
||||
than relitigating it.
|
||||
|
||||
## 2. Current topology: three concurrent tracks
|
||||
|
||||
Any branching strategy for this repo must first model what actually ships.
|
||||
There is no single production. Three tracks run concurrently, each with its own
|
||||
consumers, artifact, and patch path:
|
||||
|
||||
| Track | Consumers | Artifact | Deploys via | Patch path today |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| Nightly | Community users running `--front-end-version @latest` (thousands) | GitHub release built from main | Nightly version-bump PR, tag, release | Fix merges to main, ships next nightly |
|
||||
| Cloud | cloud.comfy.org users | Static assets built per commit SHA into GCS by the cloud repo | testcloud tracks the active `cloud/x.y` tip; staging and prod promote a SHA pointer via overlays and ArgoCD | Cherry-pick to `cloud/x.y` via backport label, then staged deploy |
|
||||
| Core GA / desktop | ComfyUI stable and desktop installs | `comfyui-frontend-package` wheel on PyPI, pinned exactly in ComfyUI `requirements.txt` | Biweekly train: patch bump on `core/x.y`, PyPI publish, pin-bump PR on ComfyUI | Cherry-pick to `core/x.y`, patch release, new pin PR |
|
||||
|
||||
As of mid July 2026: main is at 1.48.x, cloud runs the 1.47 line, and the
|
||||
ComfyUI pin is still on 1.45.x. Three minors of distance between main and core
|
||||
GA is the normal operating state, not an anomaly.
|
||||
|
||||
```mermaid
|
||||
flowchart LR
|
||||
FIX[Fix merges to main] --> NB[Nightly bump and tag] --> NU[Nightly users]
|
||||
FIX --> CLB[Cherry-pick onto cloud line] --> STG[Staging deploy] --> PRD[Prod deploy] --> CU[Cloud users]
|
||||
FIX --> COB[Cherry-pick onto core line] --> PYP[PyPI patch release] --> PIN[ComfyUI pin update] --> DU[Core and desktop users]
|
||||
```
|
||||
|
||||
Key mechanics worth naming because the strategy must preserve or deliberately
|
||||
replace each one:
|
||||
|
||||
- Every minor bump on main automatically freezes the previous minor into paired
|
||||
`core/x.y` and `cloud/x.y` branches and rotates the matching backport labels.
|
||||
- Backports are label-driven: `needs-backport` plus a target label triggers an
|
||||
automated cherry-pick PR; conflicts fall back to a documented manual path.
|
||||
- The cloud deploy already promotes build-once artifacts: assets are built one
|
||||
time per SHA, and staging and prod move by repointing that SHA. Rollback is a
|
||||
pointer revert with no rebuild.
|
||||
- Core GA promotion is a biweekly scheduled train that publishes to PyPI and
|
||||
drafts the ComfyUI pin-bump PR.
|
||||
- A rotating release owner (the "sheriff") drives promotions; per-PR backport
|
||||
ownership was deliberately moved to feature pods in June 2026.
|
||||
- Frontend builds destined for core GA soak in the core nightly channel
|
||||
(about two weeks for graph-touching changes) because there is no automated
|
||||
signal when a change breaks a community custom node. The soak is a
|
||||
compensating control for missing telemetry, not a property of safe code.
|
||||
|
||||
These mechanics are documented operationally in `docs/release-process.md`,
|
||||
which remains the runbook of record for day-to-day releases. This document
|
||||
governs the target strategy, and that runbook gets updated as each phase in
|
||||
section 8 lands.
|
||||
|
||||
## 3. Pain points of the current process
|
||||
|
||||
Numbered for traceability to section 7. All are observed, not hypothetical.
|
||||
|
||||
- **PP1. Drift compounds on long-lived lines.** The 1.45 line spans 69 days
|
||||
from its minor cut to its latest patch and is still the pinned line: 19
|
||||
patch releases, 61 commits landed on it after it froze (54 backport
|
||||
cherry-picks plus 7 patch-release bumps), and main-vs-stable divergence of
|
||||
428 PRs by the latest patch. Backports onto old lines increasingly do not
|
||||
apply cleanly, and some do not even work once applied because the
|
||||
surrounding code diverged (a fix was backported to a GA line where it could
|
||||
not function without a second dependency PR, and was ultimately abandoned
|
||||
as a known issue).
|
||||
- **PP2. Per-PR cherry-picks can silently miss a target.** A fix that needed
|
||||
two cloud lines landed on only one; the next release shipped the regression
|
||||
back to users. Three independent safeguards (notification bot, sweep check,
|
||||
PR comment) all failed to catch it (FE-713).
|
||||
- **PP3. Release batches grow superlinearly risky.** Missing one train window
|
||||
meant a double-minor release: 401 PRs validated in a single QA pass, the
|
||||
largest surface the team has ever had to certify, including high-risk
|
||||
subsystem rewrites.
|
||||
- **PP4. The backport tooling itself fails silently.** The notification bot was
|
||||
down for six weeks without anyone noticing; the repo-level auto-merge setting
|
||||
is off, which silently turned the backport auto-merge flag into a no-op and
|
||||
required a workaround workflow; the manual retry path of the backport
|
||||
workflow was broken (FE-1282).
|
||||
- **PP5. Freeze state lives in conversation, not tooling.** A verbally frozen
|
||||
line was bumped past by an engineer who reasonably read stalled automation as
|
||||
a missed dispatch. The resulting premature minor cut cost one to two weeks of
|
||||
recovery. The post-mortem's first action item: encode freeze state durably.
|
||||
- **PP6. Human bottlenecks and burnout.** One engineer ran the release rotation
|
||||
for roughly two months straight; urgent core releases have required chasing
|
||||
approvals late at night. Backport PRs add review friction (authors cannot
|
||||
always self-approve, approvers are asleep, label permissions vary).
|
||||
- **PP7. Latency invites bypasses.** A simple graph change takes a minimum of
|
||||
about 16 days to reach core GA (review, two-week soak, release), up to 27 if
|
||||
it just misses a window. Under deadline pressure a customer demo was shipped
|
||||
via a one-off deployment that routed around the release process entirely,
|
||||
creating an unowned production surface.
|
||||
- **PP8. Release state is hard to read.** Answering "what exactly is on cloud
|
||||
prod" requires cross-referencing a branch tip, a deploy tag, and a SHA in
|
||||
another repo's values file. Public release surfaces (GitHub releases, docs
|
||||
changelog, in-app update notice) have drifted out of sync.
|
||||
- **PP9. QA involvement is ad hoc.** Test plans are hand-built per release
|
||||
(one release needed a bespoke plan naming 84 high-risk PRs); there is no
|
||||
standing definition of entry and exit criteria per promotion gate.
|
||||
- **PP10. Everything above burns cross-team trust.** Slow stable releases are
|
||||
a recurring source of cross-team friction, and the release rotation absorbs
|
||||
that pressure personally.
|
||||
|
||||
## 4. Review of the draft 4-tier proposal
|
||||
|
||||
### 4.1 The proposed model
|
||||
|
||||
The draft proposes four long-lived branches, each auto-deploying to its own
|
||||
standing environment, promoted wholesale (no cherry-picks) by a release
|
||||
manager, with hotfixes cut from main re-entering through staging, and a
|
||||
main-to-testing back-merge closing each cycle:
|
||||
|
||||
```mermaid
|
||||
flowchart LR
|
||||
T[testing branch and env] -->|release manager merge| D[dev branch and env]
|
||||
D -->|release manager merge| S[staging branch and env]
|
||||
S -->|release manager merge| M[main branch equals prod]
|
||||
M -.->|back-merge at cycle end| T
|
||||
M -->|urgent defect| H[hotfix branch] --> S
|
||||
```
|
||||
|
||||
Claimed properties: engineers merge freely into testing; dev is a guaranteed
|
||||
stable baseline; staging mirrors production for UAT; main is 1-to-1 with what
|
||||
is deployed, "eliminating the complicated and error-prone process of
|
||||
back-porting entirely."
|
||||
|
||||
This model was reviewed against the org context in sections 2 and 3, the
|
||||
industry evidence in section 5, and an adversarial defense pass (a reviewer
|
||||
whose explicit job was to defend the proposal and refute the critique; several
|
||||
initial critique points were withdrawn or narrowed as a result and are noted
|
||||
below).
|
||||
|
||||
### 4.2 What the proposal gets right
|
||||
|
||||
These instincts are correct, and each is adopted in section 6 via a cheaper
|
||||
mechanism than a branch tier:
|
||||
|
||||
- **K1. Deployed state should be inspectable in git.** Today it is not (PP8).
|
||||
Adopted as a machine-maintained prod pointer (6.5).
|
||||
- **K2. Freezes must be enforced by tooling, not by verbal agreement.** The
|
||||
premature-bump incident (PP5) proves it. Adopted as freeze-as-code (6.6).
|
||||
- **K3. Promotions need named owners and explicit gates.** Adopted via GitHub
|
||||
Environments protection rules and the existing rotation (6.4).
|
||||
- **K4. Engineers need a guaranteed-good base to branch from when trunk is
|
||||
red.** Adopted as last-green stable tags on main (6.7).
|
||||
- **K5. Fix propagation needs a hard discipline.** The draft's down-merge SLA
|
||||
becomes the inverse and industry-standard rule: upstream first, fix lands on
|
||||
main before any release line (6.3).
|
||||
- **K6. Whole-unit promotion beats per-PR picking wherever a track allows it.**
|
||||
Wholesale promotion makes the PP2 failure class (a missed per-PR pick)
|
||||
unrepresentable. Adopted for the cloud track as whole-artifact promotion,
|
||||
and bounded on the core track by a drift SLO (6.8).
|
||||
- **K7. Every promotion should auto-deploy its surface.** Directionally right
|
||||
and already sanctioned by in-flight work that removes no-value manual steps
|
||||
(FE-1176). Adopted throughout.
|
||||
- **K8. QA deserves a first-class, named slot in the release path.** The only
|
||||
document in this debate that gives QA an explicit stage. Adopted as defined
|
||||
entry/exit criteria per gate instead of a dedicated environment (6.4).
|
||||
|
||||
### 4.3 Findings
|
||||
|
||||
Ordered by severity. "Withdrawn" notes mark initial critiques that did not
|
||||
survive the adversarial defense, kept here so the review is honest about its
|
||||
own error bars.
|
||||
|
||||
**Fatal (any one of these blocks adoption as written):**
|
||||
|
||||
- **F1. The central claim is false for this product.** "Eliminates
|
||||
back-porting entirely" cannot hold while ComfyUI core pins an exact
|
||||
`comfyui-frontend-package` version and desktop users run pinned installs.
|
||||
A linear four-tier chain holds exactly one version in flight; it has no
|
||||
mechanism to patch a shipped 1.45 while 1.47 is mid-promotion and 1.48 is
|
||||
on nightly. Fixes to pinned lines remain cherry-picks plus PyPI patch
|
||||
releases, that is, backports. The proposal eliminates the word by omitting
|
||||
the surface that needs it: nowhere does it mention the pin, PyPI, desktop,
|
||||
the soak, or custom nodes. (Narrowed but confirmed under defense: wholesale
|
||||
trains do reduce drift-driven backport volume; they do not remove the
|
||||
pinned-version axis.)
|
||||
- **F2. It re-models an existing artifact pipeline as merge ceremony, and
|
||||
regresses it.** Cloud promotion is already build-once: one SHA-keyed asset
|
||||
build, promoted by pointer, rollback with no rebuild. Branch-tier CD means
|
||||
each tier builds its own merge commit, so the artifact validated on staging
|
||||
is provably not the artifact deployed from main. Worse, GitHub pull request
|
||||
merges never fast-forward, so gated promotion PRs mint a new SHA at every
|
||||
tier: "human-gated promotion" and "main is SHA-identical to prod" are
|
||||
mutually exclusive with native GitHub mechanics. One of the model's two
|
||||
core promises must break.
|
||||
- **F3. The soak has no home.** The two-week custom-node soak is the org's
|
||||
central regression control for its worst historical failure class. In a
|
||||
linear chain it either occupies the staging tier permanently (capping all
|
||||
release cadence at soak length and colliding with the hotfix path) or
|
||||
silently disappears while its automated replacement remains unstaffed.
|
||||
- **F4. It rows against the org's sanctioned direction.** The shipping-speed
|
||||
initiative targets PR-to-prod under 48 hours, backport rate under 10
|
||||
percent, and stable tags cut from main every 24 to 48 hours, backed by an
|
||||
internal PRD and in-flight Linear work (FE-1176, FE-602/BE-800, release
|
||||
gate automation). The draft adds an N-day merge freeze (at roughly 330
|
||||
merged PRs per month across all targets, about 230 of them on main, that
|
||||
is a real stall), three human promotion gates,
|
||||
and full-cycle latency for every change. DORA's trunk research lists "no
|
||||
code freezes" as a success criterion for elite delivery.
|
||||
|
||||
**Major:**
|
||||
|
||||
- **F5. The hotfix path is inoperable mid-cycle.** Hotfixes cut from main
|
||||
re-enter through staging. Whenever staging holds next-cycle content in UAT
|
||||
(most of the calendar), an urgent prod fix either waits out UAT or drags
|
||||
unreleased work to production. At the observed fix rate on live lines
|
||||
(54 backports in the 53 days after the 1.45 line froze, about one per
|
||||
day), "restart UAT on every hotfix" is a validation livelock. Notably, both parents of this model do it differently:
|
||||
GitLab Flow is strictly upstream-first, and GitFlow merges hotfixes to
|
||||
master directly. The draft inherits the weaker property of each.
|
||||
- **F6. "Guaranteed stable dev" is a smoke test, not a guarantee.** dev
|
||||
receives testing wholesale, so at promotion time dev is byte-identical to
|
||||
testing at freeze. The only stability delta is whatever a quick smoke pass
|
||||
catches, and the tier's only unique content comes from direct-to-dev
|
||||
hotfixes, which is the environment-drift anti-pattern. A second standing
|
||||
environment running identical code adds configuration-drift false positives,
|
||||
not signal. (Narrowed under defense: as a lagged checkpoint, dev does have
|
||||
value mid-cycle; but a last-green tag delivers the same checkpoint without
|
||||
a branch, an environment, or a gate.)
|
||||
- **F7. Every gate is human and every suite is undefined.** The model's
|
||||
stability claims rest entirely on "smoke tests," "all regression and
|
||||
acceptance tests," and release-manager judgment. No suite, owner, or pass
|
||||
criterion is named anywhere. Against roughly 330 PRs per month with a
|
||||
two-person QA function, undefined manual gates become either the bottleneck
|
||||
or a rubber stamp; the 401-PR pass (PP3) becomes the steady state, since
|
||||
biweekly wholesale promotion at current velocity is roughly 110 to 165 PRs
|
||||
per batch (main-line content alone runs about 110 per two weeks).
|
||||
- **F8. No rollback story, and env-branch rollback poisons future
|
||||
promotions.** The draft never mentions rollback. Reverting a bad promotion
|
||||
merge makes git treat that content as already-merged, silently dropping it
|
||||
from the next wholesale promotion until someone reverts the revert. And the
|
||||
moment a prod deploy fails after the staging-to-main merge, main is ahead of
|
||||
prod again, the exact state the model claims to abolish.
|
||||
- **F9. The four auto-deploy pipelines do not exist and cannot be driven from
|
||||
this repo.** This repo never deploys anything; it fire-and-forgets a
|
||||
dispatch to the cloud repo, which owns builds, secrets, and ArgoCD. Standing
|
||||
up per-branch CD means building four cross-repo deploy paths while the
|
||||
backend concurrently moves to per-service delivery with its own promotion
|
||||
model. The proposal is also purely additive: since it cannot serve the
|
||||
pinned-package axis (F1), all existing release machinery keeps running
|
||||
beside it, and the net delta is plus three eternal branches, plus one or two
|
||||
standing environments, plus three human gates.
|
||||
|
||||
**Spec gaps and smaller issues:**
|
||||
|
||||
- **F10. Wholesale-minus-exceptions needs a written procedure.** Excluding one
|
||||
bad PR from a promotion is revert-then-reland (and revert-the-revert later),
|
||||
a known git footgun that will otherwise be improvised for the first time
|
||||
during a release emergency. The draft's own exception clause re-authorizes
|
||||
the cherry-picking it bans. (Initial claim "this is not a git operation" was
|
||||
withdrawn: revert/reland is standard practice; the finding is that the
|
||||
procedure is unwritten and its failure mode, silently dropped features, has
|
||||
no detecting check.)
|
||||
- **F11. Freeze semantics are underspecified rather than contradictory.**
|
||||
(Initial "rules 1.c and 1.d contradict" was withdrawn.) The real gap:
|
||||
stabilization fixes must merge during the freeze, so the freeze is porous by
|
||||
design, with no tooling-enforced definition of what may enter, which is
|
||||
exactly the un-encoded-freeze failure mode of PP5.
|
||||
- **F12. Naming and contract frictions.** A tier named dev that is more stable
|
||||
than testing inverts every industry convention; repointing main's semantics
|
||||
would break the nightly channel contract, though the model does not actually
|
||||
require the top tier to be named main (withdrawn as a fatal objection: tier
|
||||
names are free variables; kept as a migration note). Rule 6.a's ancestry
|
||||
policy has no native GitHub primitive and needs a small custom status check;
|
||||
cheap, but this org's post-mortems document exactly this class of bespoke
|
||||
automation failing silently (PP4).
|
||||
|
||||
### 4.4 Scorecard
|
||||
|
||||
| Dimension | Score | Basis |
|
||||
| --- | --- | --- |
|
||||
| Internal coherence | 5/10 | F5, F8, F10, F11 are real; several initial coherence critiques were withdrawn under defense |
|
||||
| Fit to this product's topology | 3/10 | F1, F3: the pinned-package axis and the soak are unmodeled |
|
||||
| Operability on GitHub with current infra | 2/10 | F2 SHA exclusivity, F9 pipelines do not exist, additive process surface |
|
||||
| Alignment with current industry evidence | 3/10 | Section 5; env-branch promotion is a documented anti-pattern for continuously deployed surfaces, with narrow exceptions that map to pipeline approval gates |
|
||||
| Quality of underlying instincts | 8/10 | K1 through K8 are correct and adopted |
|
||||
| **Overall, as written, for this repo** | **4/10** | Fatal findings F1 through F4 |
|
||||
|
||||
For fairness: as a generic process for a single-track web application in the
|
||||
era it comes from, this model rates roughly 6.5/10; GitLab Flow's environment
|
||||
branch variant, which it closely resembles, remains documented practice. The
|
||||
low score here is about fit to this product, not about the model's pedigree.
|
||||
|
||||
### 4.5 Disposition of each proposal element
|
||||
|
||||
| Proposal element | Disposition | Why |
|
||||
| --- | --- | --- |
|
||||
| Four long-lived environment branches | Reject | F1, F2, F3, F9; environments become pipeline stages instead |
|
||||
| Wholesale promotion, no cherry-picks | Adapt | Correct for cloud as whole-artifact promotion (K6); impossible for the pinned core axis (F1) |
|
||||
| Release-manager gated merges at three tiers | Adapt | One named human gate per surface via GitHub Environments required reviewers; no new role hierarchy (PP6) |
|
||||
| N-day code freeze on the integration branch | Reject | F4; freezes are the documented anti-pattern and main never freezes today |
|
||||
| Anything in testing ships in the current cycle | Adapt | Correct WIP-limit instinct; becomes the enforceable drift SLO in 6.8 |
|
||||
| dev tier as stable baseline | Replace | Last-green stable tags on main (K4, F6) |
|
||||
| staging tier for UAT and alpha access | Keep the capability | Already exists as the staging environment plus auth-gated and per-PR preview deploys; formalize QA criteria (K8) |
|
||||
| main equals prod, 1-to-1 | Replace | Machine-maintained prod pointer ref (K1); merge-based parity is unenforceable on GitHub (F2) |
|
||||
| Hotfix via branch from main through staging | Reject | F5; hotfix path per track defined in 6.9 |
|
||||
| Back-merge main to testing at cycle end | Reject | Unnecessary once there is a single eternal branch; upstream-first makes down-merges structural (K5) |
|
||||
| GitHub-enforced containment policy (6.a) | Adopt the idea | As a 20-line ancestry status check plus release-content verification (6.8), with heartbeat alerts given PP4 |
|
||||
| Version tag on every prod deploy | Already exists | Cloud deploy tags and nightly tags; kept and unified in the prod pointer spec |
|
||||
|
||||
## 5. What the industry does
|
||||
|
||||
Genealogy first, because the draft cites a remembered decade-old post with
|
||||
detailed charts. No post titled "a better git branching strategy" from that
|
||||
era appears to exist. The remembered title and charts almost certainly belong
|
||||
to Vincent Driessen's "A successful Git branching model" (nvie.com, 2010, the
|
||||
GitFlow post). The remembered content, four auto-deploying environment tiers
|
||||
promoted by wholesale merge, matches GitLab Flow's environment-branches
|
||||
variant (2014). The hotfix-from-prod and back-merge mechanics are GitFlow's.
|
||||
The draft is therefore a hybrid of two models from 2010 to 2014, both of whose
|
||||
authors have since published significant caveats:
|
||||
|
||||
- Driessen added a note to the GitFlow post in 2020: teams shipping
|
||||
continuously delivered web software should use a much simpler flow such as
|
||||
GitHub Flow; GitFlow-style models remain reasonable for explicitly versioned
|
||||
software with multiple versions in the wild. Both halves apply here, because
|
||||
this product is both.
|
||||
- GitLab's own docs now describe the environment-branch variant alongside a
|
||||
release-branch variant with an explicit upstream-first rule (fix on main,
|
||||
cherry-pick down), the same policy Google and Red Hat practice.
|
||||
|
||||
The current consensus, by product shape:
|
||||
|
||||
- **Continuously deployed services** (GitHub, Shopify, Google, the DORA
|
||||
research corpus): one mainline, short-lived topic branches, merge queue,
|
||||
feature flags, canary or percentage rollout. Environments are deployment
|
||||
pipeline stages or GitOps folders, not branches. DORA's trunk criteria:
|
||||
three or fewer active branches, daily merges, no code freezes; elite
|
||||
performers correlate strongly with this shape. Environment-branch promotion
|
||||
is repeatedly documented as an anti-pattern (Fowler's branching patterns;
|
||||
the GitOps literature: merge-order skew, unintended config riding along,
|
||||
undocumented prod drift from direct-to-branch hotfixes, per-branch rebuilds
|
||||
violating build-once). The one conceded exception, regulated sign-off audit
|
||||
trails, is satisfied by pipeline approval gates with deployment history.
|
||||
- **Versioned or embedded software** (Chrome, Firefox, Microsoft Release
|
||||
Flow): trunk plus short-lived per-release branches, cut just in time,
|
||||
fix-only, upstream-first cherry-picks with approval, never merged back,
|
||||
retired when the version leaves support. Chrome ships a milestone every four
|
||||
weeks this way; Firefox calls the cherry-pick an uplift and gates it on
|
||||
release management approval. The heavyweight tooling both maintain is
|
||||
evidence that backports are a cost to be minimized, not a routine channel.
|
||||
- **Hybrid products like this one** split the axes: trunk plus pipeline
|
||||
promotion and flags for the continuously deployed surface; trunk plus
|
||||
short-lived release branches for the pinned, versioned surface. That is
|
||||
Microsoft Release Flow on one side and Chrome-style trains on the other,
|
||||
sharing one trunk.
|
||||
|
||||
Sources: nvie.com/posts/a-successful-git-branching-model,
|
||||
about.gitlab.com/topics/version-control/what-is-gitlab-flow,
|
||||
dora.dev/capabilities/trunk-based-development,
|
||||
martinfowler.com/articles/branching-patterns.html,
|
||||
trunkbaseddevelopment.com/branch-for-release,
|
||||
octopus.com/blog/stop-using-branches-deploying-different-gitops-environments,
|
||||
beyond.minimumcd.org/docs/reference/practices/immutable-artifacts,
|
||||
devblogs.microsoft.com/devops/release-flow-how-we-do-branching-on-the-vsts-team,
|
||||
chromium.googlesource.com/chromium/src/+/master/docs/process/release_cycle.md,
|
||||
wiki.mozilla.org/Release_Management/Release_Process,
|
||||
github.blog/engineering/engineering-principles/deploying-branches-to-github-com,
|
||||
shopify.engineering/successfully-merging-work-1000-developers.
|
||||
|
||||
## 6. Recommended strategy
|
||||
|
||||
### 6.1 Principles
|
||||
|
||||
- **P1. One eternal branch.** main is the single integration branch and the
|
||||
nightly channel. Its semantics are a locked contract: nightly releases,
|
||||
npm type publishing, cloud build dispatch, CI triggers, and community
|
||||
tooling all key off it.
|
||||
- **P2. Build once, promote artifacts.** Every merge to main produces one
|
||||
SHA-keyed artifact. Environments receive that artifact by pointer; nothing
|
||||
is ever rebuilt per environment. The artifact that passes staging and canary
|
||||
is byte-identical to the artifact in production.
|
||||
- **P3. Upstream first, always.** Every fix lands on main first, with tests.
|
||||
Release lines receive changes only via the backport pipeline. Direct commits
|
||||
to `core/*` and `cloud/*` are blocked for humans (release automation
|
||||
excepted). This is the rule that prevents the PP2 class.
|
||||
- **P4. Branches only where a version demands one.** A long-lived branch
|
||||
exists only to serve a pinned, shipped version (`core/x.y` while ComfyUI
|
||||
pins it). No branch exists to represent an environment.
|
||||
- **P5. Invariants over notifications.** Every policy in this document that
|
||||
matters is enforced by a required check or a reconciling audit with
|
||||
heartbeat alerting, not by a bot that posts a message. PP4 is the reason.
|
||||
- **P6. Gates are automation-first, with at most one named human approval per
|
||||
surface,** held by the existing release rotation. No new role hierarchy.
|
||||
- **P7. Small batches on a fixed cadence.** The unit of release stays as small
|
||||
as the gates allow. The 401-PR batch is the documented anti-goal.
|
||||
|
||||
### 6.2 Branch roles
|
||||
|
||||
| Branch | Lifetime | Purpose | Who writes to it |
|
||||
| --- | --- | --- | --- |
|
||||
| `main` | Eternal | Integration, nightly channel, source of all builds | Engineers via peer-approved PRs |
|
||||
| `core/x.y` | Weeks; dies when the ComfyUI pin moves off x.y | Serve the pinned PyPI line | Backport automation and release bumps only |
|
||||
| `cloud/x.y` | Interim only; retired per 6.10 | Cloud release train until cloud CD lands | Backport automation only |
|
||||
| `feature/*`, `fix/*` | Days | Topic branches off main (or a last-green tag when main is red) | The author |
|
||||
| Prod pointer ref (`deployed/cloud-prod`) | Eternal, machine-written | Mirrors the verified deployed SHA after every prod sync, rollbacks included | Deploy pipeline only |
|
||||
|
||||
Target state, Phase 2 and later (until the cloud branch retirement in 6.10
|
||||
lands, the cloud leg still promotes from the interim cloud/x.y line):
|
||||
|
||||
```mermaid
|
||||
flowchart LR
|
||||
ENG[Engineer merges PR to main] --> BUILD[One artifact built per SHA]
|
||||
BUILD --> NIGHT[Nightly tag and release]
|
||||
BUILD --> TC[testcloud] --> SC[staging] --> CAN[Canary percent rollout] --> PROD[Cloud prod]
|
||||
PROD --> PTR[Prod pointer ref advances]
|
||||
ENG --> GATE[Overnight release gate CI] --> TAGS[Last-green stable tag]
|
||||
TAGS -->|next minor cut| LINE[core release line, backports only] --> TRAIN[Biweekly core train: patch bump, PyPI, pin PR]
|
||||
```
|
||||
|
||||
### 6.3 The two release axes, explicitly separated
|
||||
|
||||
- **Cloud axis (continuous):** main to testcloud to staging to prod is
|
||||
artifact promotion through pipeline stages. Gates live in the pipeline: the
|
||||
overnight release-gate suite for candidate selection, a staging smoke
|
||||
checklist with named QA criteria, and canary metrics with automatic
|
||||
rollback once the canary program lands. Incomplete features land on main
|
||||
dark behind feature flags so the trunk stays releasable while work is in
|
||||
progress. No environment branches.
|
||||
- **Core axis (versioned):** `core/x.y` branches exist because an exact
|
||||
version is pinned by another product and shipped to desktops. They are cut
|
||||
automatically (as today; in the target state the cut is taken from the
|
||||
newest last-green tag rather than the raw pre-bump commit), receive fixes
|
||||
only via upstream-first backports, and are retired when the pin moves. The fix for PP1 is not a new topology;
|
||||
it is shortening how long these lines live and how far they drift (6.8).
|
||||
|
||||
### 6.4 Promotion gates
|
||||
|
||||
Implemented as GitHub Environments deployment protection rules (required
|
||||
reviewers plus deployment history), not as branch merges. This natively
|
||||
provides the audit trail that is the one legitimate case for human-gated
|
||||
promotion, and it is the same primitive the draft's release-manager gates
|
||||
actually wanted.
|
||||
|
||||
| Gate | Trigger | Automated criteria | Human |
|
||||
| --- | --- | --- | --- |
|
||||
| PR into main | Every PR | Unit, component, lint, typecheck | One peer approval |
|
||||
| Release-gate verdict | Nightly | Behavioral suite, critical-path browser tests, custom-node harness when live | None; red verdict is an incident |
|
||||
| Staging promotion | On green candidate | Artifact exists, gate verdict green | None (auto) |
|
||||
| Prod promotion | Sheriff action | Staging smoke checklist green | One: rotation owner |
|
||||
| Core GA train | Biweekly schedule | Line is green, soak or harness criteria met | One: pin PR merge in ComfyUI |
|
||||
|
||||
QA's slot (K8): the staging smoke checklist and the release regression scope
|
||||
are standing documents with named QA owners and defined entry and exit
|
||||
criteria, replacing hand-built per-release plans (PP9).
|
||||
|
||||
### 6.5 Production visibility (adopts K1)
|
||||
|
||||
A machine-maintained ref, `deployed/cloud-prod`, is written by the deploy
|
||||
pipeline only after the production sync reports healthy, and it mirrors the
|
||||
deployed SHA in both directions: a verified rollback moves the ref backward
|
||||
to the rolled-back SHA (a recorded, non-fast-forward move with the rollback
|
||||
reason logged, which the reconciler treats as healthy), so the ref never lies
|
||||
about production during an incident. A reconciling check compares the ref against the cloud repo's
|
||||
deployed SHA on every deploy and alerts on mismatch (P5). Answering "what is on prod" becomes
|
||||
`git log deployed/cloud-prod`, which is the legitimate requirement behind the
|
||||
draft's main-equals-prod rule, delivered without merge ceremony and immune to
|
||||
the F2 impossibility.
|
||||
|
||||
### 6.6 Freeze-as-code (adopts K2)
|
||||
|
||||
Freeze state is a first-class marker (a repo variable or protected file) that
|
||||
release automation checks before acting: the minor-bump dispatch refuses to
|
||||
cut past a frozen line, and backport targeting warns on frozen targets. All
|
||||
release bots carry heartbeat alerts; silence is an incident. These are the
|
||||
premature-bump post-mortem action items, promoted into the strategy.
|
||||
|
||||
### 6.7 Stable base for engineers (adopts K4)
|
||||
|
||||
The nightly release-gate verdict stamps an immutable dated tag (for example
|
||||
`stable/2026-07-18`) on the newest commit that passed the full gate and
|
||||
advances a `stable/latest-green` branch-style ref to it. A moving ref, not a
|
||||
moving tag, on purpose: git clients do not force-update moved tags by
|
||||
default, so a moving tag would silently go stale locally. When main is red,
|
||||
engineers branch from the ref or the dated tag instead of a standing dev
|
||||
branch. Red main is itself an incident
|
||||
with a named owner, which is what actually keeps the trunk usable.
|
||||
|
||||
### 6.8 Drift limits and content verification (adopts K6 and the containment idea)
|
||||
|
||||
- **Drift SLO:** the pinned release line being older than 28 days, or the pin
|
||||
sitting more than two minors behind main, pages the rotation owner and
|
||||
forces a train decision. This is the WIP limit that the draft expressed as
|
||||
"anything in testing ships this cycle," made enforceable. PP1's 69-day line
|
||||
becomes structurally impossible to reach silently. A breach also blocks the
|
||||
next minor cut until acknowledged. The SLO activates with a burn-in
|
||||
exemption for the already-breached 1.45 line, and a breach that traces to
|
||||
an unmerged ComfyUI pin PR escalates per risk R2 instead of paging the
|
||||
rotation, because that lever is not frontend-side.
|
||||
- **Convergence invariant:** a scheduled check asserts every commit on a live
|
||||
release line is an ancestor of main or arrived via the backport pipeline,
|
||||
and that every prod-deployed SHA is reachable from a release line. Roughly
|
||||
20 lines of CI; catches what three notification bots missed (PP2).
|
||||
- **Release-content verification:** before a train departs, an automated
|
||||
check confirms every PR labeled for that line actually landed on it, and
|
||||
posts the diff of intent versus content. FE-713 becomes a failing check
|
||||
instead of a user report.
|
||||
|
||||
### 6.9 Hotfix and rollback runbooks
|
||||
|
||||
Interim topology (while cloud/x.y lines exist; after the 6.10 retirement the
|
||||
cloud leg promotes last-green artifacts from main instead):
|
||||
|
||||
```mermaid
|
||||
flowchart TD
|
||||
Q1{Where is the defect live?} -->|Nightly only| A1[Fix on main, ships next nightly]
|
||||
Q1 -->|Cloud prod| A2[Fix on main with tests] --> A3[Backport label to the live cloud line] --> A4[Staging smoke on the patched artifact] --> A5[Prod promotion by rotation owner]
|
||||
Q1 -->|Core GA or desktop| A6[Fix on main with tests] --> A7[Backport label to the pinned core line] --> A8[Patch release to PyPI] --> A9[Pin bump PR on ComfyUI]
|
||||
Q1 -->|Deploy itself is bad, code is fine| R1[Rollback: repoint prod to previous SHA, no rebuild]
|
||||
```
|
||||
|
||||
Rules: hotfixes never restart full UAT and never bundle unreleased content;
|
||||
validation scope is the affected area plus the standing smoke checklist. The
|
||||
sanctioned path must stay hours-scale (target: under 8 working hours from
|
||||
fix merged on main to prod promotion), because the org has already
|
||||
demonstrated that a slower sanctioned path manufactures shadow deploy surfaces
|
||||
(PP7). Rollback is always a pointer move, never a git revert of a promotion;
|
||||
revert is reserved for code defects on main with an explicit reland step.
|
||||
|
||||
### 6.10 Cloud branch retirement (the end state for the cloud axis)
|
||||
|
||||
`cloud/x.y` branches exist today because cloud deploys from a frozen line.
|
||||
Once the release-gate suite plus canary auto-rollback are proven (several
|
||||
clean ramps and at least one real auto-rollback in production), cloud promotes
|
||||
last-green artifacts from main directly and the cloud branch family retires.
|
||||
The cutover checklist must cover: release-branch creation stops cutting
|
||||
`cloud/<minor>` and rotating cloud labels, the cloud deploy tag workflow
|
||||
retires, build dispatch keys on main SHAs and promotion events, and testcloud
|
||||
repoints from the cloud line tip to last-green tags. Until then, cloud/x.y
|
||||
continues exactly as today; this document changes nothing about it yet.
|
||||
|
||||
## 7. How this solves the current pain points
|
||||
|
||||
| Pain point | Mechanism in this strategy | Status |
|
||||
| --- | --- | --- |
|
||||
| PP1 drift on long lines | Drift SLO (6.8) caps line age; shorter trains; upstream-first keeps lines fix-only | Mitigated; fully solved only if ComfyUI adopts pin bumps at train cadence (risk R2) |
|
||||
| PP2 missed per-PR backports | Release-content verification plus convergence invariant (6.8); whole-artifact promotion on cloud removes per-PR picks there entirely | Solved: becomes a failing check, and unrepresentable on the cloud axis post 6.10 |
|
||||
| PP3 giant QA batches | Fixed cadence with drift SLO forces small trains (P7); release-gate CI carries per-merge burden | Mitigated; batch size cannot silently grow past the SLO, and drops under 100 if the 13.1 decision moves the core train to weekly |
|
||||
| PP4 silent tooling failure | Invariants and reconciling audits with heartbeat alerts replace notification-only bots (P5); prerequisite fixes named in 8 | Mitigated; bots can still break, but silence itself now alarms |
|
||||
| PP5 verbal freezes | Freeze-as-code guards the bump and backport paths (6.6) | Solved: the premature-bump incident becomes mechanically impossible |
|
||||
| PP6 human bottleneck | One human gate per surface on the existing rotation; merge-on-green everywhere else; backport approval rules simplified by making automation the only writer to release lines | Mitigated; the rotation remains, its late-night surface shrinks |
|
||||
| PP7 latency invites bypasses | Hours-scale sanctioned hotfix lane (6.9); canary replaces calendar soak for cloud; core latency shrinks as the harness replaces the soak | Partially solved now, fully contingent on the custom-node harness (risk R1) |
|
||||
| PP8 unreadable release state | Prod pointer ref (6.5); unified tags; one strategy document | Solved |
|
||||
| PP9 ad hoc QA | Standing gate criteria with named QA owners (6.4) | Solved by process definition |
|
||||
| PP10 cross-team trust | Publish the delivery metrics (9) on a fixed cadence so progress is legible instead of argued | Mitigated; trust follows the numbers |
|
||||
|
||||
The honest line on backports: this strategy does not eliminate them, because
|
||||
nothing can while another product pins an exact version. It makes them rare
|
||||
(drift SLO plus faster trains), safe (upstream-first plus content
|
||||
verification), and boring (automation is the only writer to release lines).
|
||||
The draft's promise was elimination; the achievable promise is a backport
|
||||
rate under 10 percent with no silent misses.
|
||||
|
||||
## 8. Rollout plan
|
||||
|
||||
Prerequisites (fix before anything else changes): repair the manual backport
|
||||
retry workflow (FE-1282), turn on the repo auto-merge setting and retire the
|
||||
cron workaround, add heartbeat alerts to every release bot, and correct the
|
||||
stale PyPI-attribution in docs/release-process.md so the runbook of record
|
||||
matches the actual workflows.
|
||||
|
||||
- **Phase 0, immediately:** adopt this document; freeze-as-code; prod pointer
|
||||
ref; drift SLO alerting; convergence invariant check; standing QA gate
|
||||
criteria drafted (their operational acceptance is P1 item 9). No branch
|
||||
topology changes at all.
|
||||
- **Phase 1, with the release gate:** overnight release-gate suite produces
|
||||
last-green tags; stable tags become the engineer base and the cloud
|
||||
candidate source; staging promotion goes automatic on green.
|
||||
- **Phase 2, with the canary:** percentage rollout with metric-gated
|
||||
auto-ramp and auto-rollback on cloud prod; hotfix lane switches to
|
||||
canary-validated promotion.
|
||||
- **Phase 3, retirement:** cloud/x.y family retires per 6.10. Core/x.y
|
||||
remains, on shorter trains, as long as ComfyUI pins exact versions; the
|
||||
calendar soak retires only when the custom-node harness is live, staffed,
|
||||
and has held the escaped-regression guardrail flat for two full cycles.
|
||||
|
||||
## 9. Goals and success metrics
|
||||
|
||||
| Goal | Metric | Target | Horizon |
|
||||
| --- | --- | --- | --- |
|
||||
| Ship fast | PR merge to cloud prod | Under 48 hours median | Phase 2 |
|
||||
| Backports rare | Backported PRs / merged PRs | Under 10 percent | Phase 2 |
|
||||
| Lines stay young | Max live release-line age | Under 28 days | Phase 1 |
|
||||
| No silent misses | Escaped regressions from missed backports | Zero | Phase 0 |
|
||||
| Batches stay small | PRs per QA-certified release | Under 100 | Phase 2, after the 13.1 cadence decision |
|
||||
| Prod is legible | Time to answer "what is on prod" | One git command | Phase 0 |
|
||||
| No shadow deploys | Unowned one-off production surfaces | Zero new | Phase 0 |
|
||||
|
||||
Leading indicators are the first three; report all seven on a fixed cadence in
|
||||
the cross-team channel (PP10).
|
||||
|
||||
## 10. Non-goals
|
||||
|
||||
- Renaming or repointing main. Its contract is locked (P1).
|
||||
- Eliminating release branches while ComfyUI pins exact frontend versions.
|
||||
That coupling is a product decision owned elsewhere; this strategy minimizes
|
||||
its cost rather than pretending it away.
|
||||
- Standing up new long-lived environments. Existing surfaces (testcloud,
|
||||
staging, per-PR previews) cover every tier the draft wanted.
|
||||
- Changing ComfyUI core's own release process, cadence, or the soak policy it
|
||||
requires; this document only defines what the frontend does on each axis.
|
||||
- Prescribing the backend or cloud repo's deployment architecture (per-service
|
||||
delivery work proceeds independently).
|
||||
|
||||
## 11. Requirements
|
||||
|
||||
**P0 (the strategy is not adopted without these):**
|
||||
|
||||
1. Freeze-as-code marker checked by version-bump and backport automation.
|
||||
Acceptance: a bump dispatch against a frozen line fails with a clear error;
|
||||
verified by test.
|
||||
2. Prod pointer ref written only by the deploy pipeline after verified sync,
|
||||
with a reconciling audit. Acceptance: mismatch alarms within one deploy
|
||||
cycle.
|
||||
3. Convergence invariant and release-content verification checks, with
|
||||
heartbeat alerting. Acceptance: a deliberately mislabeled test PR is caught
|
||||
before a train departs.
|
||||
4. Drift SLO alerting at 28 days of line age or two minors of pin divergence.
|
||||
Acceptance: alert fires in a rehearsal against a stale line.
|
||||
5. Documented hotfix and rollback runbooks (6.9) with an hours-scale SLA.
|
||||
Acceptance: one rehearsed hotfix per quarter meets the SLA.
|
||||
6. Prerequisite tooling fixes: FE-1282, auto-merge setting, bot heartbeats.
|
||||
Acceptance: a manually dispatched backport retry succeeds end to end; a
|
||||
backport PR merges via repo auto-merge with the cron workaround retired;
|
||||
killing a release bot raises its heartbeat alert.
|
||||
|
||||
**P1 (fast follows):**
|
||||
|
||||
7. Overnight release-gate suite stamping last-green tags; red verdict is an
|
||||
incident with a named owner. Acceptance: a green run stamps the dated tag
|
||||
within an hour; a red run opens an owned incident.
|
||||
8. Automatic staging promotion on green; GitHub Environments protection rules
|
||||
with deployment history as the prod gate. Acceptance: a green candidate
|
||||
reaches staging with zero human actions, and a prod promotion without the
|
||||
required reviewer is blocked in rehearsal.
|
||||
9. Standing QA gate criteria with named owners replacing per-release plans.
|
||||
Acceptance: the next release runs from the standing criteria with no
|
||||
bespoke test plan authored.
|
||||
|
||||
**P2 (future, explicitly sequenced):**
|
||||
|
||||
10. Canary with metric-gated auto-ramp and auto-rollback. Acceptance: one
|
||||
production auto-rollback triggered by canary metrics in a game day.
|
||||
11. cloud/x.y retirement per the 6.10 checklist. Acceptance: the cutover
|
||||
checklist fully executed, verified by a workflow inventory showing no
|
||||
half-dead machinery.
|
||||
12. Soak retirement gated on the custom-node harness guardrail. Acceptance:
|
||||
the harness holds the escaped-regression guardrail flat for two full
|
||||
cycles before any soak shortening.
|
||||
|
||||
## 12. Risk register
|
||||
|
||||
| ID | Risk | L | I | Level | Mitigation | Owner |
|
||||
| --- | --- | --- | --- | --- | --- | --- |
|
||||
| R1 | Custom-node harness stays unstaffed, so soak cannot shrink and core latency persists | High | High | Critical | Escalate staffing as the single gating dependency of the whole program; do not shorten the soak before the harness holds the guardrail | Eng leadership |
|
||||
| R2 | ComfyUI pin adoption lags frontend trains, so drift SLO breaches are unresolvable frontend-side | High | High | Critical | Agree a pin-adoption SLA with core release stakeholders; SLO breaches tracing to an unmerged pin PR escalate to leadership instead of paging the rotation | FE eng manager with core stakeholders |
|
||||
| R3 | Canary program slips; cloud branches linger in a half-retired state | Med | High | High | Retirement is the last step with explicit cutover criteria; interim state is exactly today's process | Release pipeline owner |
|
||||
| R4 | Prod pointer or invariant checks silently break, recreating PP4 | Med | High | High | Heartbeat alerts plus reconciliation against the deploy system on every run; silence pages | DevOps |
|
||||
| R5 | Drift SLO is ignored under deadline pressure | Med | Med | Medium | SLO breach pages the rotation and blocks the next minor cut until acknowledged | Rotation owner |
|
||||
| R6 | Incremental rollout gives no visible "fixed" moment; cross-team pressure continues | Med | Med | Medium | Publish the section 9 metrics on a fixed cadence; make progress legible | FE eng manager |
|
||||
| R7 | Flag debt accumulates as flags gate incomplete work on trunk | Med | Low | Low | Review-for-deletion date on every flag; monthly cleanup | FE leads |
|
||||
|
||||
Doing nothing carries its own critical risks (drift compounds, the next
|
||||
missed backport ships another regression, rotation burnout continues); the
|
||||
status quo is not the safe option.
|
||||
|
||||
## 13. Open questions
|
||||
|
||||
1. Cadence of the core train once the drift SLO lands: stay biweekly or move
|
||||
to weekly? At current velocity the under-100 batch target in section 9 is
|
||||
reachable only with weekly trains, so this question blocks that one
|
||||
metric's horizon. (Rotation owner plus core release stakeholders; blocking
|
||||
for the batch-size target, non-blocking for everything else.)
|
||||
2. Should the prod pointer cover core GA and desktop as refs too
|
||||
(`deployed/core-ga`), or is PyPI plus the pin authoritative enough?
|
||||
(Frontend leads; non-blocking.)
|
||||
3. Who owns the standing QA gate criteria documents long-term as QA staffing
|
||||
changes? (QA plus FE eng manager; blocking for Phase 0 sign-off.)
|
||||
4. Does the org-admin limitation on separate go-live approvers (surfaced
|
||||
during FE-1176) need resolution before GitHub Environments become the prod
|
||||
gate? (DevOps plus org admins; blocking for P1 item 8.)
|
||||
|
||||
## 14. References
|
||||
|
||||
Internal: `docs/release-process.md` (the operational runbook of record,
|
||||
updated as phases land); the shipping-speed initiative and its release-gate
|
||||
and canary design docs; the release rotation runbook; the
|
||||
premature-version-bump post-mortem; FE-713, FE-1176, FE-1282, FE-602/BE-800;
|
||||
the draft 4-tier proposal this document reviews.
|
||||
|
||||
External: see section 5 source list.
|
||||
@@ -126,7 +126,7 @@ describe('useManagerState', () => {
|
||||
})
|
||||
|
||||
describe('managerUIState property', () => {
|
||||
it('should return DISABLED state when no manager flags are present', () => {
|
||||
it('should return DISABLED state when --enable-manager is NOT present', () => {
|
||||
systemStatsStore.$patch({
|
||||
systemStats: systemStatsFixture(['python', 'main.py']),
|
||||
isInitialized: true
|
||||
@@ -141,6 +141,7 @@ describe('useManagerState', () => {
|
||||
systemStats: systemStatsFixture([
|
||||
'python',
|
||||
'main.py',
|
||||
'--enable-manager',
|
||||
'--enable-manager-legacy-ui'
|
||||
]),
|
||||
isInitialized: true
|
||||
|
||||
@@ -67,14 +67,22 @@ export function useManagerState() {
|
||||
'extension.manager.supports_csrf_post'
|
||||
)
|
||||
|
||||
const argv = systemStats.value?.system?.argv
|
||||
if (argv?.includes('--enable-manager-legacy-ui')) {
|
||||
return ManagerUIState.LEGACY_UI
|
||||
}
|
||||
if (!argv?.includes('--enable-manager')) {
|
||||
// Check command line args first (highest priority)
|
||||
// --enable-manager flag enables the manager (opposite of old --disable-manager)
|
||||
const hasEnableManager =
|
||||
systemStats.value?.system?.argv?.includes('--enable-manager')
|
||||
|
||||
// If --enable-manager is NOT present, manager is disabled
|
||||
if (!hasEnableManager) {
|
||||
return ManagerUIState.DISABLED
|
||||
}
|
||||
|
||||
if (
|
||||
systemStats.value?.system?.argv?.includes('--enable-manager-legacy-ui')
|
||||
) {
|
||||
return ManagerUIState.LEGACY_UI
|
||||
}
|
||||
|
||||
// Server exposes v4 but is missing the CSRF-hardened POST endpoints
|
||||
// (Manager < 4.2.1). Treat as INCOMPATIBLE — hide manager UI and
|
||||
// prompt user to upgrade. csrf_post is an independent axis from v4.
|
||||
|
||||
Reference in New Issue
Block a user